Description of Project: 

Sukut is known to complete a difficult project on time and in very adverse conditions, as with the channel for Spectrum 5.
County permits and plan approvals delayed the start date so that the majority of the construction was in the winter months with active stream beds to contend with.
The following is a brief description of work completed:
• Built a massive 40 foot wide and 5000 foot long channel to divert water from the client’s site.
• Excavated 800,000 cubic yards of dirt.
• Constructed 4,600 lineal feet. of large box culvert, 12′ x 14′ double box.
• Self-performed 75% of the work.

Client: 
The Irvine Company
Total Value: 
$9M
Date Completed: 
Friday, April 25, 2014
Location: 
Irvine, CA