East County Substation

Client:
San Diego Gas and Electric Company
Location:
Jacumba, CA
Description of Project:
Sukut Construction performed 1.1 million yards of mass grading to construct two large substation pads across 92 acres near Jacumba, California. Over 106,000 tons of aggregate base were placed for the substation area and under the paved access roads that Sukut also constructed as part of this project. Sukut installed drainage features such as box culverts, concrete-lined ditches, and rip rap protection.