- Client:
- Rosendin Electric
- Location:
- Rosamond, CA
- Description of Project:
-
Sukut constructed a 100 MWac solar project in the Rosamond area. The civil work consisted of 680 acres of site preparation and grading, 55,000 linear feet of access roads, and 33,000 linear feet of drainage swales. Sukut also installed over 42,000 piles and 3,700 rows of the Nextracker racking system.