- Client:
- NextEra Energy
- Total Value:
- $51 Mil
- Date Completed:
- February 28, 2013
- Location:
- Blythe, CA
- Description of Project:
-
Sukut constructed 80,000 cubic yards of soil cement lined slopes in a five mile storm water diversion channel surrounding a 2,200 acre solar energy plant in Blythe, California. Total scope of work consisted of moving 3.5 million cubic yards of dirt, as well as various other civil improvements including installation of site storm drain, pre-cast bridge structures and placement of 100,000 plus tons of rip rap.