Townsite Solar Civil, Piles, and Racking Project

Client:
Rosendin Electric
Location:
Boulder City, NV
Description of Project:
Sukut constructed a 200 MW solar project, completing the civil, channel, piles, and racking. This included grading and site prep of a 1000-acre site, 950,000 square feet of access roads, 10,600 linear feet of soil cement-treated channels,  84,800 driven piles, and 6,300 rows of Nextracker racking system.

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW