Westside Solar Civil, Trenching and Pile Driving Project

Client:
NextEra Energy
Date Completed:
August 31, 2016
Location:
City of Five Points, CA
Description of Project:

Sukut performed grading, trenching, road construction and post-installation services on the 20 MW photovoltaic Solar field in the City of Five Points in California. Project highlights included:

  • 55,000 cubic yards of excavation
  • 150 acres of Array Field grading
  • Pile driving of 12,000 structural piers
  • 10,000 liner feet of trenching and backfill of AC/DC cable.