- Client:
- NextEra Energy
- Date Completed:
- August 31, 2016
- Location:
- City of Five Points, CA
- Description of Project:
-
Sukut performed grading, trenching, road construction and post-installation services on the 20 MW photovoltaic Solar field in the City of Five Points in California. Project highlights included:
- 55,000 cubic yards of excavation
- 150 acres of Array Field grading
- Pile driving of 12,000 structural piers
- 10,000 liner feet of trenching and backfill of AC/DC cable.