FRB Landfill Main Haul Road Crossing Repair

Client:
PUB Construction, Inc.
Date Completed:
July 31, 2017
Location:
Irvine, CA
Description of Project:

Sukut completed the emergency repair of the storm drain inlet and road crossing across the main landfill access road. Work included demolition of existing drainage features, construction of 3 concrete inlet structures, installation of 200 linear feet of 60-inch CHDPE storm drain, and asphalt paving. The project required a significant amount of coordination with the landfill operations and traffic control due to working on the main landfill access road.

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW