FRB Landfill Wetlands Basin Repair Project

Client:
OC Waste and Recycling
Date Completed:
November 7, 2019
Location:
Irvine, CA
Description of Project:

Sukut remediated the damage caused by a breach in a wetlands basin berm. During the project, Sukut cleared out the gabion baskets within the breach, excavated 6,000 cubic yards of material, re-compacted 15,000 cubic yards of material, and constructed a new concrete 2,200-square-foot spillway. Sukut also installed a 6,000-square-foot geosynthetic clay liner.