FRB Landfill Wetlands Basin Repair Project

Client:
OC Waste and Recycling
Date Completed:
November 7, 2019
Location:
Irvine, CA
Description of Project:

Sukut will remediate the damage caused by a breach in a wetlands basin berm. During the project, Sukut will clear out the gabion baskets within the breach, excavate 6,000 cubic yards of material, re-compact 15,000 cubic yards of material, and construct a new concrete 2,200 square foot spillway. Sukut will also install a 6,000 square foot geosynthetic clay liner.

© 2021 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW