- Client:
- OC Waste and Recycling
- Date Completed:
- November 7, 2019
- Location:
- Irvine, CA
- Description of Project:
-
Sukut remediated the damage caused by a breach in a wetlands basin berm. During the project, Sukut cleared out the gabion baskets within the breach, excavated 6,000 cubic yards of material, re-compacted 15,000 cubic yards of material, and constructed a new concrete 2,200-square-foot spillway. Sukut also installed a 6,000-square-foot geosynthetic clay liner.