Keller Canyon Landfill Phase 3C Liner System Project

Client:
Republic Services
Location:
Pittsburg, CA
Description of Project:

This six-acre cell construction project included 30,000 cubic yards of excavation. The cell consisted of a four-layer system: subdomain layer, clay liner, LCRS gravel layer, and operations layer. Sukut imported a total of 10,000 tons of gravel for the subdrain and LCRS layers, as well as 10,000 cubic yards of a one-inch screened material.

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW