Ox Mountain Landfill Phase XXI Liner Project

Client:
Republic Services
Location:
Half Moon Bay, CA
Description of Project:

This project involves the excavation of 100,000 cubic yards of hard rock to improve the drainage of the existing site and expand the landfill’s refuse area. Additionally, Sukut crews will be installing 2,000 linear feet of subdrain pipe, 5,000 linear feet of LCRS collector piping, and over 5,000 linear feet of 6-inch Leachate Transmission piping.

© 2021 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW