Sunshine Canyon Landfill CC-4 Part 4A Mass Excavation and Liner Project

Client:
Republic Services
Location:
Sylmar, CA
Description of Project:

This project included the construction of a 4.5-acre cell, which consisted of five layers (two clay layers, sand, gravel, and screened operations layer). Sukut performed 600,000 cubic yards of mass excavation to get to the subgrade before starting cell construction. Additionally, Sukut worked on miscellaneous civil improvements, and performed 50,000 square feet of AC paving, along with constructing 300 linear feet of 72-inch CMP pipe.

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW