Sunshine Canyon Office Relocation Project

Client:
Republic Services
Location:
Sylmar, CA
Description of Project:

This project’s intent is to relocate existing offices to a new location. Grading work consists of 100,000 cubic yards of excavation material. Miscellaneous civil improvements include installation of 36-inch CHDPE storm drain pipe, 6-inch waterline, and numerous types of surface drainage improvements.

© 2020 Sukut Construction LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW