Rosamond Central Solar Civil and Trenching Project

Sukut will be performing clearing and grading of an 195 MWac 1100-acre solar site, including construction of 50,000 linear feet of access roads. Additionally, Sukut will implement erosion control and almost 100,000 linear feet of trenching.  Read more

Techren 3, 4, 5 Solar Civil and Mechanical Project

Techren site is a 115 MW photovoltaic solar farm located in Boulder City, Nevada. Sukut’s scope of work includes the construction of 84,000 linear feet of access roads with aggregate base, 74,000 linear feet of trenching and backfilling, 30,000 linear feet of silt fencing, and 600 acres of ground stabilizing dust palliative installation. Additionally, Sukut…Read more

Rancho Seco Solar Civil and Trenching Site Work

This civil site work project is located on a 160 MW solar site and consists of SWPPP implementation, mowing 560 acres, 79,820 linear feet of 20-foot wide compacted native roads, 29,550 linear feet of 20-foot wide aggregate-based roads, various culverts and low water crossings, 53 concrete inverter pads with aggregate beauty rings, 38,500 linear feet…Read more

Blythe 3 Solar Civil and Pile Driving Project

This project includes the construction of a 1000-acre, 125 MWac solar site. The work includes 783,000 square feet of based roads, 1,778,800 square feet of compacted native roads, 60,780 linear feet of trenching, 42 concrete inverter pads, and driving of 80,300 piles.Read more

CIW Solar Civil Project

On this project, Sukut is performing clearing, grading, and access road work. Sukut is also installing foundation piles, racking, and panels for a solar project adjacent to and supporting the California Institute for Women in Chino CA.Read more

Los Coches Substation Modification

Sukut constructed Phase 1 of 3 for SDG&E to accommodate upgraded 138kV and 69kV yards, transmission lines, and other substation facilities.  The project consisted of blasting, handling, and exporting 165,000 cubic yards of rock in addition to rock dowels, new access roads, retaining and masonry walls, and drainage/infiltration facilities. Project highlights included: Sukut self-performed 93%…Read more

Solar Oasis Project

Sukut completed work on this 20 MW AC solar array project that was built on 180 acres of land located in the western Mojave Desert, near Palmdale, California. The site houses approximately 98,000 photovoltaic solar panels. Sukut’s scope included site clearing, tree removal, mass grading, dam inspection, construction of new construction entrances, Arizona crossing, water…Read more

Calipatria and Centinela Solar Civil and Mechanical Projects

This project consists of two separate 12 MW sites in which Sukut will be performing all site work including clearing, Stormwater Pollution Prevention Plans implementation, and construction of project’s roads. In addition, Sukut will be driving all foundation piles and installing the solar racking system.Read more