Description of Project:

Project included construction and operation of 4,300 linear feet of temporary conveyor belt with jaw crusher system to facilitate the export of 800,000 cubic yards of soil material, drilling and blasting of 200,000 cubic yards of rock material, 350,000 cubic yards of remedial grading, construction of two, 12’x8’ precast arch culverts, construction of three pedestrian and light vehicle bridges, installation of new site storm drainage system, construction of 1,200 linear feet of 6’x8’ concrete storm drain channel, for the expansion of a park in Hollywood Hills.