- Client:
- Toll Brothers
- Location:
- Porter Ranch, CA
- Description of Project:
-
Sukut is performing 245,000 cubic yards of remedial grading and 195,000 cubic yards of mass excavation, including export to prepare for the construction of 65 single-family home lots. Also included in the scope is the construction of 300 feet of 48-inch RCP storm drain and energy dissipater structure.