- Client:
- Atherton Newport
- Total Value:
- $1.80M
- Date Completed:
- July 1, 2010
- Location:
- Lake Forest, CA
- Description of Project:
-
Sukut graded the six acre hillside project at Pittsford and Osterman in Lake Forest, CA. Sukut excavated 116,000 cubic yards of earth, built 30 multi-leveled housing pads, installed a storm drain system, and backfilled a mechanically stabilized earth retaining wall during the project.