Summit Crest

Client:
Atherton Newport
Total Value:
$1.80M
Date Completed:
July 1, 2010
Location:
Lake Forest, CA
Description of Project:

Sukut graded the six acre hillside project at Pittsford and Osterman in Lake Forest, CA. Sukut excavated 116,000 cubic yards of earth, built 30 multi-leveled housing pads, installed a storm drain system, and backfilled a mechanically stabilized earth retaining wall during the project.

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW