Projects

Alternative Energy

Ramsey Solar Pile Driving and Racking Project

Sukut is installing the mechanical scope of this 500 MWac solar project. ...

Read More

Eastline Solar Civil Mechanical (Piles and Racking) and Electrical Trenching Project

This project consists of the construction of a 100 MWAC solar site and ...

Read More

TWC Westside Solar Civil and Pile Driving Project

This project is the last phase of the previous TWC Westside Solar projects: ...

Read More

Copper Mountain 5 Solar Civil Project

The project consists of over 1,100 acres of grading, 20 miles of electrical ...

Read More

Rosamond Central Solar Civil and Trenching Project

Sukut will be performing clearing and grading of an 195 MWac 1100-acre ...

Read More

Techren 3, 4, 5 Solar Civil and Mechanical Project

Techren site is a 115 MW photovoltaic solar farm located in Boulder City, ...

Read More

Desert Harvest 1 and 2 Access Roads Project

This project includes construction of 105,600 linear feet of 20 and 16-foot ...

Read More

Rancho Seco Solar Civil and Trenching Site Work

This civil site work project is located on a 160 MW solar site and consists ...

Read More

Blythe 3 Solar Civil and Pile Driving Project

This project includes the construction of a 1000-acre, 125 MWac solar site. ...

Read More

TWC Solar – New Columbia and Belridge Solar Civil and Mechanical project

Sukut was awarded a TWC Solar – New Columbia and Belridge Solar Civil and ...

Read More

CIW Solar Civil Project

On this project, Sukut is performing clearing, grading, and access road ...

Read More

Los Coches Substation Modification

Sukut constructed Phase 1 of 3 for SDG&E to accommodate upgraded 138kV ...

Read More

Solar Oasis Project

Sukut completed work on this 20 MW AC solar array project that was built on ...

Read More

Calipatria and Centinela Solar Civil and Mechanical Projects

This project consists of two separate 12 MW sites in which Sukut will be ...

Read More

Moapa Southern Paiute Solar, Phases 1 and 2 Project

Sukut provided grading and trenching services on the Moapa Southern Paiute ...

Read More

Garland Solar

Sukut completed the site preparation on this solar project in three phases ...

Read More

Westside Solar Civil, Trenching and Pile Driving Project

Sukut performed grading, trenching, road construction and post-installation ...

Read More

EMWD Solar Energy Site Prep PH3 Project

This project includes site development at four of the district’s regional ...

Read More

Voyager Wind Trench Backfill Project

The scope of work consists of screening and backfilling of a medium voltage ...

Read More

Southampton Solar Civil

Sukut performed excavation, new roadway construction and installation of ...

Read More

Gloucester Solar Civil Project

This project involves the construction of a 20 MW 150 acre solar site in ...

Read More

East County Substation

Sukut Construction performed 1.1 million yards of mass grading to construct ...

Read More

Antelope Expansion 2 Solar Access Road Project

On this project Sukut will construct approximately 2.2 million square feet ...

Read More

Panoche Valley Solar Phase 2 Civil Project

The scope of work involves civil improvements to a 600 acre photovoltaic ...

Read More

Panoche Valley Solar MV/DC Projects

This project in Panoche, San Benito County, CA, involves excavation and ...

Read More

Wistaria Solar Civil and Trenching Project

The project included civil work for a 745-acre site, construction of ...

Read More

Summer and Winter Wheats Solar Civil Project

Sukut was awarded the Summer and Winter Wheats Solar Civil Project, located ...

Read More

Mojave Solar Project

Sukut Construction completed the civil site preparation in 2012 for the ...

Read More

Genesis Solar Energy Project

Sukut constructed 80,000 cubic yards of soil cement lined slopes in a five ...

Read More

Coram Ridge Wind Farm Project

Sukut completed the construction of over 11 miles of access roads and moved ...

Read More

Environmental Services

Badlands Landfill C2P5 and C3P2 Liner Expansion Project

This project involves over 10,000 cubic yards of excavation and engineered ...

Read More

Altamont Landfill – FA 2 Phase 3 Cell Construction & Stormwater Improvements

This phase of the Altamont project includes excavation of 2.6 million cubic ...

Read More

Riverside County Landfills Daily Cover Excavation and On-Call Improvements Project

This project consists of 200,000 cubic yards of daily cover excavation and ...

Read More

Visalia Landfill Phase 4 Expansion Project

This project includes mass excavation of 355,000 cubic yards of material ...

Read More

Sunshine Canyon Landfill CC-4 Part 4A Mass Excavation and Liner Project

This project includes the construction of a 4.5-acre cell, which consists ...

Read More

Disaster Debris Removal and Disposal Services Project

This project is for the on-call services to respond to any natural ...

Read More

Landfill, Disposal Site and Waste Tire Site Remediation Project

Sukut has been awarded a three-year contract by Cal Recycle for Landfill, ...

Read More

Ox Mountain Landfill Phase XXI Liner Project

This project involves the excavation of 100,000 cubic yards of hard rock to ...

Read More

Keller Canyon Landfill Phase 3C Liner System Project

This six-acre cell construction project includes 30,000 cubic yards of ...

Read More

Prima Capistrano Greenery Project

This project involves moving over 100,000 cubic yards of dirt and providing ...

Read More

FRB Bee Canyon Greenery Project

This project consists of 740,000 cubic yards of earthwork, construction of ...

Read More

FRB Landfill Wetlands Basin Repair Project

Sukut will remediate the damage caused by a breach in a wetlands basin ...

Read More

Sunshine Canyon Office Relocation Project

This project’s intent was to relocate existing offices to a new location. ...

Read More

El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project

This is a combination of two projects. The first project is a 10-acre ...

Read More

California Street Landfill Phase 4 Expansion Project

On this project, Sukut is constructing a new landfill cell, including mass ...

Read More

San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project

The work on this project includes excavation of up to two million cubic ...

Read More

Calabasas Landfill Project

Sukut is working at this emergency liner repair project in Agoura, CA. The ...

Read More

Sycamore Landfill Project

Sukut is working on a landfill expansion at the Sycamore Canyon Landfill. ...

Read More

Sonoma Landfill CC-3 Construction Project

This landfill expansion project consists of 20,000 cubic yards of ...

Read More

Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project

The project includes excavation of 1.4 million cubic yards of soil needed ...

Read More

Chiquita Canyon Landfill C6 Liner Project

The project included excavation of 1 million cubic yards of soil for the ...

Read More

Sunshine Canyon DWP Waterline Project

The project consists of replacing the landfill’s existing HDPE ...

Read More

Butte Fire Debris Removal Project

The Butte Fire that started on September 9, burned 70,868 acres. In the ...

Read More

Sunshine Canyon Landfill CC-4P3 Liner Construction Project

This mass excavation project consists of 700,000 cubic yards of material to ...

Read More

Camp Fire Debris Removal Cleanup Project

Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...

Read More

El Sobrante LF Phase C 1 Partial Final Closure Project

This project for Waste Management consists of approximately 1.5 million ...

Read More

Mid Valley Landfill Unit 4 Ph 1 Liner Construction

The project includes installation of 24-inch thick low permeability ...

Read More

Clear Lake Shoreline Cleanup

This project involved an emergency cleanup of wildfire debris that was ...

Read More

Frank R. Bowerman Landfill Crews Quarters and Storage Facility

The project consisted of the design, permitting and construction of modular ...

Read More

FRB Groundwater Protection System

Sukut performed work on the Groundwater Protection System project, ...

Read More

Olinda Alpha Landfill Phase 2

Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...

Read More

Altamont LF – Compost Facility Grading & Drainage

Sukut Construction worked closely with subcontractors to move in excess of ...

Read More

Wildfire Post Debris Removal

Sukut has been contracted by the California Governor’s Office of Emergency ...

Read More

Fink Road Landfill – 2 Cell 6 Composite Liner Project

This project for Stanislaus County consists of a 17 AC expansion which ...

Read More

Savage Canyon Landfill Liner Project

The scope of work includes 430,000 cubic yards of mass excavation and ...

Read More

Sunshine Canyon Landfill Buttress

Work consists of 4 million cubic yards of excavated material along with the ...

Read More

Sunshine Canyon LF Cell CC-4 P2 Liner Project

Sukut completed a 5.8-acre cell construction, consisting of a five-layer ...

Read More

The Sunshine Canyon Landfill Vegetative Cover Project

The Sunshine Canyon Landfill Vegetative Cover Project consists of placing ...

Read More

Santa Rosa/Napa Fire Debris Cleanup Project

Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...

Read More

Salton City Landfill Phase 1B Cell Construction

Sukut Construction was awarded the Salton City Landfill Phase 1B Cell ...

Read More

Thomas Fire Project

Thomas Fire was the largest fire in the state of California that destroyed ...

Read More

Detwiler Fire Debris Removal and Recovery

The project scope includes removal, storage, transportation, and disposal ...

Read More

Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

The project consists of construction of a composite liner system including ...

Read More

Lancaster Landfill Liner Phase 1b and 1c

Liner expansion construction included mass excavation, engineered fill, ...

Read More

FRB Landfill Main Haul Road Crossing Repair

Sukut completed emergency repair of the storm drain inlet and road crossing ...

Read More

Mid-Valley Landfill and Liner Expansion

Mid Valley landfill is an active municipal landfill that opened Unit Three ...

Read More

Newberry and Yermo Sanitary Landfills

Sukut Construction excavated and stockpiled 60,000 cubic yards of soil. We ...

Read More

Palmdale Water Reclamation Plant

Palmdale Water Reclamation Plant Stage Five Effluent Management Facilities ...

Read More

San Bernardino County Fire Response – Grass Valley

This project consisted of a massive debris removal operation for 284 homes ...

Read More

Lancaster Water Treatment Plant

Sukut constructed four, 70-acre waste water treatment ponds. This project ...

Read More

Carson Marketplace

Read More

Frank R. Bowerman Landfill

Located in Irvine, Sukut developed a new landfill cell including mass earth ...

Read More

Steel Mill Slag Pile

Sukut Construction excavated the existing slag pile to a designed sub ...

Read More

Prima Deshecha – Landfill

This project supported the landfill expansion and placement of liners in ...

Read More

Guadalupe Landfill

Guadalupe Landfill is an active landfill utilizing an active landfill gas ...

Read More

Jamestown Landfill Closure

Jamestown landfill is an inactive landfill that was originally closed in ...

Read More

Calabasas Landfill

This 35-acre project included mass excavation, installation of an ...

Read More

San Timoteo Sanitary Landfill

Sukut Construction has provided the San Bernardino County with landfill ...

Read More

Rancho Bernardo – FR

This project consisted of a massive debris removal operation for homes that ...

Read More

Tracy Tire Fire Site Remediation Services

After burning for two and one-half years, Sukut was called upon to ...

Read More

Puente Hills Landfill Slope Stabilization and Roads

Sukut Construction has been involved for many years with the Puente Hills ...

Read More

Lake Tahoe Fire Response

Sukut was part of a CIWMB response team that completed the Angora Debris ...

Read More

Phelan Sanitary Landfill

Final landfill closure construction efforts for the Phelan Landfill ...

Read More

West Miramar Landfill

Sukut Construction was contracted by the City of San Diego to perform final ...

Read More

Private Works

RMV Rienda Storm Drain Project

This project involves the installation of a large RCP storm drain up to, ...

Read More

Cow Camp Road Phase 2B and SMVD Improvements Project

The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...

Read More

FedEx Ontario Airport Taxiway A Project

Sukut was awarded the FedEx Ontario Airport Taxiway A project in Ontario, ...

Read More

Montebello Hills Grading Phases A and B Project

This project includes 3.7 million cubic yards of remedial grading and 5.6 ...

Read More

RMV PA 3.1 and CCR Rough Grading Project

Project includes mass excavation of 3,000,000 cubic yards and nearly ...

Read More

Los Patrones Parkway Improvements Phase 2 Project

The project includes the restoration of median and shoulder grading for ...

Read More

FedEx Ontario Airport Expansion Project

On this project, Sukut will be handling 450,000 cubic yards of ...

Read More

Orchard Hills, Rough Grading And Storm Drain

Sukut moved over three million cubic yards of dirt and rock to create 223 ...

Read More

Hidden Canyon PA 18

Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...

Read More

Thompson Ranch

This 3.8-million cubic yard residential grading project was a great success ...

Read More

Moorpark William Lyon Homes, Tract #5187

This residential grading project was located on a 350-acre land west of ...

Read More

St. John’s Seminary Rough Grading Project

This Southern California residential development project involved over two ...

Read More

Spencer’s Crossing – Tracts 37053-2 and 37053

A Rough Grading Project located in Murrieta within in the County of ...

Read More

Hollywood Hills

Project included construction and operation of 4,300 linear feet of ...

Read More

Rancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain

Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”.  ...

Read More

Rolling Hills Country Club Grading and Storm Drain

This project involved the transforming of the existing golf course and ...

Read More

Porter Ranch Project

This hillside residential grading project was the last phase of the Porter ...

Read More

Los Olivos Basin

Los Olivos Basin project involves the construction of multiple improvements ...

Read More

Serrano Summit Rough Grading Project

Sukut Construction was awarded the Serrano Summit Rough Grading Project, ...

Read More

Hyundai-Kia Proving Ground

Sukut graded and paved a 6.5 mile oval test track for the Hyundai/Kia ...

Read More

Harmony Grove Project

This rough grading project for Standard Pacific included 3,000,000 cubic ...

Read More

Lake Forest Drive – Phase 2

The project consisted of 26 acres of grading work that included rough ...

Read More

Crystal Cove

Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...

Read More

Pelican Hill Golf Course and Resort

In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...

Read More

Spectrum 5 at Serrano Creek

Sukut is known to complete a difficult project on time and in very adverse ...

Read More

Marshburn Storm Drain and South Channel Improvements

The land where the storm drain project was located was being leased by a ...

Read More

Headlands Reserve

Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...

Read More

Otay Quarry

This quarry is located adjacent to the Sleep Train Amphitheater in Chula ...

Read More

Summit Crest

Sukut graded the six acre hillside project at Pittsford and Osterman in ...

Read More

Audie Murphy Ranch

The $35.5 million dollar development of 650 acres into 800 housing lots ...

Read More

Portola Springs

This project was to rough grade a housing tract under a tight deadline. ...

Read More

Walnut Hills – Three Oaks Project

Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...

Read More

Kohl Ranch

A marshy track of property needed grading to create usable land for a ...

Read More

Dos Lagos 18 Hole Golf Course

Sukut reclaimed the long-abandoned dumping ground site with an innovative ...

Read More

Stone Crest

This project consisted of the grading of 98 acres of land and the ...

Read More

Public Works

L-4 Pump Station Relocation, Phase II Project

This project for the Coachella Valley Water District relocates an existing ...

Read More

Palm Canyon Wash, Stage 93 Emergency Levee Restoration Project

This emergency work contract consists of the repair and restoration of ...

Read More

Cajon Air Center – Aircraft Transient Apron Project

This project of building a transient aircraft apron connecting to existing ...

Read More

Oasis In-Lieu Recharge Project

The project consists of a 60 AF reservoir, 2835 linear feet of 72-inch ...

Read More

Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe ...

Read More

New Model Colony Archibald and Edison Infrastructure Improvements

Sukut worked as a general contractor on the roadway and utility improvement ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project

The project included the installation of approximately 40 miles of gravity ...

Read More

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, ...

Read More

West Fontana Channel Project

This project for San Bernardino County Public Works includes the ...

Read More

Hi-Desert Water District Barron Pump Station

The work includes site clearing and grubbing, trenching, shoring, ...

Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consists of the installation of 20,400 linear feet of DIP ...

Read More

Technology Drive Street Improvements

This project involved Technology Drive Street improvements near Laguna ...

Read More

RMV Multi-Purpose Path

Sukut created a multi-purpose pathway for the residents of Rancho Mission ...

Read More

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. ...

Read More

Veterans Sports Park at Tustin Legacy

The Site was previously operated as a community park by the Department of ...

Read More

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a 2 acre underground ...

Read More

Haven Avenue SD & Sewer

Sukut Construction successfully completed installation of underground ...

Read More

La Pata Avenue – Schedule C

This project entails a new road a 1/2 mile long, connecting Camino Del Rio ...

Read More

Industry Business Center West Side Grading Phase 2

This project entails grading 250 acres, excavation of native unstable soil ...

Read More

La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that ...

Read More

Trampas Canyon Dam and Reservoir Project

The Santa Margarita Water District contracted with Sukut to complete the ...

Read More

Upper Chiquita Reservoir Slope Repair

Sukut is performing repair services on the 1.5:1 slope that was damaged ...

Read More

Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4

This flood control project consists of dewatering, excavation, and the ...

Read More

Moffett and Legacy Roadway Extension Project

The project involves grading, installation of approximately 3,000 lf of new ...

Read More

Orange County Great Park Western Sector Roadway Project

The project includes removal of existing utilities and roadway in order to ...

Read More

Lakewood Stormwater Capture at Mayfair Park Project

The work included 35,000 cubic yards of export, excavation of 92,700 cubic ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

Sukut was awarded a $28.7 million Wastewater Reclamation Project, located ...

Read More

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening ...

Read More

Peters Canyon Channel Widening

Sukut conducted the final export operation required to complete the ...

Read More

San Vicente Dam

Sukut Construction worked as a subcontractor on the San Vicente Dam ...

Read More

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations ...

Read More

Central Avenue Realignment

Sukut performed the realignment of Central Ave. including constructing a ...

Read More

Riverside Drive

A long, deep vertical cut was needed to install storm drain pipe near dairy ...

Read More

Oxnard Airport

Sukut eliminated two aviation hazards caused by large open channels near ...

Read More

Tustin Armstrong

Sukut poured concrete for the 900 linear foot reinforced concrete box ...

Read More

Alton Parkway Extension

Sukut was the general contractor on this roadway and utility improvement ...

Read More

Channel Islands Campus

This was a turn key infrastructure project including two bridges, sewer and ...

Read More

Robert B. Diemer Water Treatment Plant North Access Road

Sukut constructed a one-mile hill side access road for the Metropolitan ...

Read More

San Pablo Dam Seismic Project

Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...

Read More

Upper Chiquita Reservoir

The Upper Chiquita Reservoir project required the excavation and placement ...

Read More

Cathedral City – Cove Infrastructure

Sukut upgraded outdated water, sewer and storm drainage systems, eliminate ...

Read More

Hillcrest High School

This new 50 acre campus for the new Hillcrest High School was recognized by ...

Read More

State Route 76 Widening & Realignment

Subcontractor to Granite Construction, Sukut excavated 325,000 cubic yards ...

Read More

Monument 250 Border Fence

This project entails the construction of six miles of border access road ...

Read More

Santa Ana River Trail

Sukut moved 35,000 cubic yards of dirt to accomplish this three and a half ...

Read More

Pepperdine University Graduate Campus

This project involved the movement of 3,000,000 cubic yards of earth in ...

Read More

Special Projects / Joint Ventures

Calaveras Dam Replacement Project

Sukut and our valued joint venture partners, Dragados USA and Flatiron, are ...

Read More

Lake Isabella Dam Safety Modification Project

The Lake Isabella Dam Safety Modification Project (DSMP) consists of ...

Read More

Route 905 – 6 Lane Fwy San Diego

Sukut Construction joined forces with Flatiron West, Inc. in a Joint ...

Read More

Eastern Corridor 241-261 – Toll Road

A design-built project consisting of 26 miles of new roadway including six ...

Read More

© 2020 Sukut Construction LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW