Cathedral City – Cove Infrastructure

Client:
City Of Cathedral City
Date Completed:
July 1, 2012
Location:
Cathedral City, CA
Description of Project:

Sukut upgraded outdated water, sewer, and storm drainage systems, eliminate 1,500 septic tanks, created the area’s first public sewer system, and added some of the first storm drains.
The following is a brief description of the work completed:
• Installed 17,000 lineal feet of water line, 11,000 lineal feet of storm drain, and 50,000 lineal feet of sewer line and added storm drain.
• Paved 28 acres of roadway

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW