- Client:
- California State University
- Date Completed:
- June 30, 2013
- Location:
- Camarillo, CA
- Description of Project:
-
This was a turn key infrastructure project including two bridges, sewer and water, storm drain, paving, curb, gutter and sidewalk, architecture wall treatment and installation of electrical and gas lines.
Sukut provided all grading and infrastructure for this university housing community. Through their GPS technology, Sukut was able to provide many design solutions to engineering problems without additional costs.
The following is a brief description of work completed:
• 1.1 million cubic yards of mass excavation for streets and pads.
• Sukut self-performed 70% of the work.