Oxnard Airport

Client:
County Of Ventura Department Of Airports
Date Completed:
November 9, 2013
Location:
Oxnard, CA
Description of Project:

Sukut eliminated two aviation hazards caused by large open channels near the runway that were part of an old drainage system.
The work included the construction of a reinforced concrete box culvert for an existing channel, and a 60-inch underground reinforced concrete pipe.

© 2023 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW