TVRWRF Stormwater Assessment and Improvement Project

Client:
Eastern Municipal Water District
Location:
Temecula, CA
Description of Project:

This project involved construction activities to harden an interim earthen channel and install a new spill control pond. This included excavation, regrading, backfilling, and reinforcement of the channel. Sukut will also be grading and installing concrete aprons, excavating the spill pond, lining it with a geomembrane, rehabilitating and grading two existing backwash basins, installing the slide gate, repaving the roadway, relocating existing utilities, installing electrical, instrumentation, and control systems. 