Caltrans 08-0G6914 San Bernardino County 48th Street to Route 18/138 Separation Project

Client:
Caltrans
Location:
San Bernardino County, CA
Description of Project:

Sukut is installing 14 different drainage system improvements along State Route 18 from the City of San Bernadino up to the intersection with State Route 138. This mountainous section has elevations starting at 1,400 feet and ending at 4,400 feet, with one 220-foot-long run that is particularly challenging – a slope with a gradient of over 60%. In addition to the drainage system improvements work, Sukut is also replacing over one mile of guard railing and building a new steep access road.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW