Projects

Caltrans Route 189 Emergency Work Project

This project involves the emergency closure of CA-189 to perform remedial ...

Read More

Canal Replacement Project, Segment 5B

On this project, Sukut crews are unwatering the existing canal and then ...

Read More

Bouldin Island Levee Improvement Project

On this project, Sukut will be stripping 55 acres of the existing farmland, ...

Read More

Caltrans 07-343204 I-405 Slope Repairs at Rinaldi Street Project

Sukut will reconstruct the steep earthen slopes along Interstate 405 ...

Read More

Caltrans 07-339604 Route 14 Slope Repair Project

Sukut will reconstruct a 2,000-foot-long cut slope that was graded during ...

Read More

Caltrans 08-0G6914 San Bernardino County 48th Street to Route 18/138 Separation Project

Sukut is installing 14 different drainage system improvements along State ...

Read More

Pure Water Program Morena Conveyance System Project

Sukut is installing two separate pipelines, each nearly seven miles in ...

Read More

SR-46 SLO Corridor Improvements Project

Sukut performed construction activities to widen the Cholame Section of ...

Read More

San Pasqual Undergrounding Project

Sukut removed, relocated, and replaced approximately two and a half miles ...

Read More

State Route 4 Wagon Trail Realignment, Phase 1 Project

This project will reconstruct approximately three miles of State Route 4 in ...

Read More

North Indio Flood Control Phase 2 Project

Sukut is constructing 16,000 linear feet of a flood control channel, with ...

Read More

Palm Springs MDP Line 41 Stage 3 and 4 Project

On this project, Sukut is constructing approximately 6,000 linear feet of ...

Read More

Lower Elkhorn Interior Drainage Project

Sacramento Area Flood Control Agency contracted Sukut to construct a ...

Read More

CalTrans Highway 29 Project

Sukut completed this three-mile-long highway realignment project that ...

Read More

Walteria Retention Basin Improvements Phase 1 Project

This project involves pump station upgrades, channel repairs, basin ...

Read More

Oasis In-Lieu Recharge Phase II Project

Sukut is constructing approximately 17.5 miles of pipelines of  various  ...

Read More

L-4 Pump Station Relocation, Phase II Project

Working for Coachella Valley Water District, Sukut is relocating the L-4 ...

Read More

Cajon Air Center – Aircraft Transient Apron Project

This project of building a transient aircraft apron connecting to existing ...

Read More

Oasis In-Lieu Recharge Project

The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch ...

Read More

Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project

The project included the installation of approximately 40 miles of gravity ...

Read More

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, ...

Read More

West Fontana Channel Project

This project for San Bernardino County Public Works included the ...

Read More

La Novia Roundabout Project

The La Novia Roundabout Project was designed to improve traffic flow by ...

Read More

Hi-Desert Water District Barron Pump Station

The work included site clearing and grubbing, trenching, shoring, ...

Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consisted of the installation of 20,400 linear feet of ...

Read More

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. ...

Read More

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a two-acre underground ...

Read More

La Pata Avenue – Schedule C

This project entailed constructing a new half-a-mile-long road, connecting ...

Read More

Industry Business Center West Side Grading Phase 2

This project entailed grading 250 acres, excavation of native unstable ...

Read More

La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that ...

Read More

Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4

This flood control project consisted of dewatering, excavation, and the ...

Read More

Lakewood Stormwater Capture at Mayfair Park Project

The work included 35,000 cubic yards of export, excavation of 92,700 cubic ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

The project was adjacent next to another Hi-Desert Water District project, ...

Read More

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening ...

Read More

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations ...

Read More

Riverside Drive

A long, deep vertical cut was needed to install a storm drain pipe near ...

Read More

Alton Parkway Extension

Sukut was the general contractor on this roadway and utility improvement ...

Read More

Eastern Corridor 241-261 – Toll Road

A design-built project consisting of 26 miles of new roadway including six ...

Read More

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW