Projects

Caltrans Route 189 Emergency Work Project
This project involves the emergency closure of CA-189 to perform remedial ...
Read More
Canal Replacement Project, Segment 5B
On this project, Sukut crews are unwatering the existing canal and then ...
Read More
Bouldin Island Levee Improvement Project
On this project, Sukut will be stripping 55 acres of the existing farmland, ...
Read More
Caltrans 07-343204 I-405 Slope Repairs at Rinaldi Street Project
Sukut will reconstruct the steep earthen slopes along Interstate 405 ...
Read More
Caltrans 07-339604 Route 14 Slope Repair Project
Sukut will reconstruct a 2,000-foot-long cut slope that was graded during ...
Read More
Caltrans 08-0G6914 San Bernardino County 48th Street to Route 18/138 Separation Project
Sukut is installing 14 different drainage system improvements along State ...
Read More
Pure Water Program Morena Conveyance System Project
Sukut is installing two separate pipelines, each nearly seven miles in ...
Read More
SR-46 SLO Corridor Improvements Project
Sukut performed construction activities to widen the Cholame Section of ...
Read More
San Pasqual Undergrounding Project
Sukut removed, relocated, and replaced approximately two and a half miles ...
Read More
State Route 4 Wagon Trail Realignment, Phase 1 Project
This project will reconstruct approximately three miles of State Route 4 in ...
Read More
North Indio Flood Control Phase 2 Project
Sukut is constructing 16,000 linear feet of a flood control channel, with ...
Read More
Palm Springs MDP Line 41 Stage 3 and 4 Project
On this project, Sukut is constructing approximately 6,000 linear feet of ...
Read More
Lower Elkhorn Interior Drainage Project
Sacramento Area Flood Control Agency contracted Sukut to construct a ...
Read More
CalTrans Highway 29 Project
Sukut completed this three-mile-long highway realignment project that ...
Read More
Walteria Retention Basin Improvements Phase 1 Project
This project involves pump station upgrades, channel repairs, basin ...
Read More
Oasis In-Lieu Recharge Phase II Project
Sukut is constructing approximately 17.5 miles of pipelines of various ...
Read More
L-4 Pump Station Relocation, Phase II Project
Working for Coachella Valley Water District, Sukut is relocating the L-4 ...
Read More
Cajon Air Center – Aircraft Transient Apron Project
This project of building a transient aircraft apron connecting to existing ...
Read More
Oasis In-Lieu Recharge Project
The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch ...
Read More
Cajon Air Center Drainage Project
On this project, Sukut installed approximately 3,000 feet of concrete pipe ...
Read More
Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project
The project included the installation of approximately 40 miles of gravity ...
Read More
Canyon Country Community Center Project
On this project, Sukut performed the following work: clear and grub, ...
Read More
West Fontana Channel Project
This project for San Bernardino County Public Works included the ...
Read More
La Novia Roundabout Project
The La Novia Roundabout Project was designed to improve traffic flow by ...
Read More
Hi-Desert Water District Barron Pump Station
The work included site clearing and grubbing, trenching, shoring, ...
Read More
CSA 70, Zone W4 – Pioneertown Pipeline Project
The scope of work consisted of the installation of 20,400 linear feet of ...
Read More
Clinton Keith Road Construction Phase 2
Sukut completed new road construction on Clinton Keith Road Construction. ...
Read More
Cajon Air Center Underground Detention Basin
This project entailed excavating down and installing a two-acre underground ...
Read More
La Pata Avenue – Schedule C
This project entailed constructing a new half-a-mile-long road, connecting ...
Read More
Industry Business Center West Side Grading Phase 2
This project entailed grading 250 acres, excavation of native unstable ...
Read More
La Pata Avenue Gap Closure Project – Schedule B
Sukut was performing construction services on the La Pata project that ...
Read More
Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4
This flood control project consisted of dewatering, excavation, and the ...
Read More
Lakewood Stormwater Capture at Mayfair Park Project
The work included 35,000 cubic yards of export, excavation of 92,700 cubic ...
Read More
Hi-Desert Water District Wastewater Reclamation, Phase I, Package C
The project was adjacent next to another Hi-Desert Water District project, ...
Read More
Clinton Keith Road Phase 4 Project
This road project will include roadway and rock excavation for widening ...
Read More
Port of Los Angeles
Prime contractor Sukut Construction performed grading and demo operations ...
Read More
Riverside Drive
A long, deep vertical cut was needed to install a storm drain pipe near ...
Read More
Alton Parkway Extension
Sukut was the general contractor on this roadway and utility improvement ...
Read More
Eastern Corridor 241-261 – Toll Road
A design-built project consisting of 26 miles of new roadway including six ...
Read More