Hi-Desert Water District Barron Pump Station

Client:
Hi-Desert Water District
Total Value:
$2,637,500
Location:
Yucca Valley, CA
Description of Project:

The work includes site clearing and grubbing, trenching, shoring, excavation, backfill, and compaction.  Additionally, the scope including the installation of the pump station and associated control equipment. A flow meter vault will also be constructed, as well as a diversion structure, manhole, underground piping, valves, instruments, and electrical.  Sukut will also install air condition, precast vaults, construct site security CMU wall with manual entrance gates, install coatings and linings, including PVC and polyurethane linings, and provide site paving.  The work is expected to last through the summer of 2019.