- Client:
- City of Santa Clarita
- Total Value:
- 9,303,000
- Location:
- Santa Clarita, CA
- Description of Project:
-
On this project, Sukut performed the following work: clear and grub, demolition of an existing concrete channel, rough grading, HDPE storm drain, installation of a temporary detention basin, construction of a temporary diversion channel, water treatment facility, fencing, RCP, double RCB measuring 23-feet wide by 10-feet high, new concrete channel, concrete access road, gravel yard, and new concrete driveway.