- Client:
- County of San Bernardino
- Location:
- Redlands, CA
- Description of Project:
-
The work on this project included excavation of up to two million cubic yards of material, construction of a desilting basin, two engineered stockpiles, 17 acres of composite geo-membrane liner, storm water infrastructure, and a new paved haul road. The project also included a leachate collection system, an electrical service drop, and controls to support both the leachate pumping system and the storm water pumping system.