Projects

El Sobrante Landfill Mine Reclamation and Cell 13B Excavation Project

The work is split up into two projects. The first project includes the ...

Read More

Badlands Sanitary Landfill, Phase 2 Stage 1 Liner Expansion Project

The project on this 98-acre site involves 3,000,000 cubic yards of ...

Read More

Prima Deshecha Landfill, Infrastructure Phase 1A Project

Sukut is constructing additional on and off-ramps for Orange County Waste ...

Read More

Altamont Landfill FA2 Phases 6 and 7 Project

Sukut is working on this two-year contract that includes two phases of cell ...

Read More

OAL Landfill Gas Header Upgrade Phase 1 Project

On this project, Sukut is installing approximately 4,000 linear feet of ...

Read More

Landers Sanitary Landfill Phase 1A Project

Sukut constructed the Phase 1A cell expansion of the Landers Landfill for ...

Read More

FRB Landfill Phase VIII-A1 Groundwater Protection Project

Sukut is constructing the Phase VIII-A1 groundwater protection liner system ...

Read More

Colton Sanitary Landfill Project

The project includes the installation of four million square feet of 50 mil ...

Read More

FRB Landfill Sewer and Water Line Treatment System Design-Build Project

The primary objective of this project is to contain Frank R. Bowerman ...

Read More

Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project

Sukut performed landfill improvements by excavating roughly 600,000 cubic ...

Read More

Keller Canyon Cell Phase 2F Project

This seven-acre cell construction project involved the excavation of ...

Read More

Olinda Alpha Phase 1A Valencia Greenery Project

The project includes the construction of a compost greenery at the Olinda ...

Read More

American Avenue Disposal Site Phase 1 Waste Relocation Project

The work consists of the relocation of buried wastes currently located ...

Read More

North County Landfill Area 6 Recycling Center and Sanitary Landfill Project

The project included 250,000 cubic yards of excavation to stockpile and ...

Read More

Barstow Sanitary Landfill Liner 1B Project

This project included excavating 460,000 cubic yards of earth, installing ...

Read More

Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project

The project included the excavation of 170,000 cubic yards to stockpile and ...

Read More

Vasco Road Landfill DU-13B Cell Construction 2022 Project

The project included excavation and stockpiling of 175,000 cubic yards of ...

Read More

Antelope Valley Public Landfill Cell Phase V-B Project

This project for Waste Management consisted of 1.5 million cubic yards of ...

Read More

El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project

On this project, Sukut performed work that included excavation, fine grade, ...

Read More

Prima Deshecha Landfill Zone 4 Habitat Mitigation Project

Sukut performed drainage improvements at the Prima Deshecha Landfill which ...

Read More

Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project

Sukut worked on the expansion of the groundwater protection liner system at ...

Read More

Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project

Acting as a CMAR, Sukut made significant infrastructure upgrades to the ...

Read More

El Sobrante Landfill Phase 13A Project

This project included clearing, excavating 4,500,000 cubic yards of ...

Read More

Altamont Landfill FA2 Phase 4 Project

This project included the excavation of 1,300,000 million cubic yards of ...

Read More

Northern Branch for the 2020 Fire Debris and Tree Removal Project

Sukut entered into a joint venture with Pacific States Environmental ...

Read More

Tree Removal Services Project for the Camp Fire in Butte County

Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...

Read More

Badlands Landfill C2P5 and C3P2 Liner Expansion Project

This project involved over 10,000 cubic yards of excavation and engineered ...

Read More

Disaster Debris Removal and Disposal Services Project

This project is for the on-call services to respond to any natural ...

Read More

Prima Capistrano Greenery Project

This project involved moving over 100,000 cubic yards of dirt and providing ...

Read More

FRB Bee Canyon Greenery Project

This project consisted of 740,000 cubic yards of earthwork, construction of ...

Read More

El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project

This is a combination of two projects. The first project was a 10-acre ...

Read More

San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project

The work on this project included excavation of up to two million cubic ...

Read More

Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project

The project included the excavation of 1.4 million cubic yards of soil ...

Read More

Chiquita Canyon Landfill C6 Liner Project

The project included the excavation of one million cubic yards of soil for ...

Read More

Butte Fire Debris Removal Project

The Butte Fire that started on September 9, burned 70,868 acres. In the ...

Read More

Sunshine Canyon Landfill CC-4P3 Liner Construction Project

This mass excavation project consisted of 700,000 cubic yards of material ...

Read More

Camp Fire Debris Removal Cleanup Project

Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...

Read More

El Sobrante LF Phase C 1 Partial Final Closure Project

This project for Waste Management consisted of approximately 1.5 million ...

Read More

Mid Valley Landfill Unit 4 Ph 1 Liner Construction

The project included the installation of 24-inch thick low permeability ...

Read More

Clear Lake Shoreline Cleanup

This project involved an emergency cleanup of wildfire debris that was ...

Read More

Olinda Alpha Landfill Phase 2

Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...

Read More

Wildfire Post Debris Removal

Sukut has been contracted by the California Governor’s Office of Emergency ...

Read More

Santa Rosa/Napa Fire Debris Cleanup

Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...

Read More

Thomas Fire Project

At the beginning of 2018, Sukut was contracted by CalRecycle to perform the ...

Read More

Detwiler Fire Debris Removal and Recovery

The project scope included the removal, storage, transportation, and ...

Read More

Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

The project consisted of the construction of a composite liner system ...

Read More

Frank R. Bowerman Landfill

Located in Irvine, Sukut developed a new landfill cell including mass earth ...

Read More

Prima Deshecha – Landfill

This project supported the landfill expansion and placement of liners in ...

Read More

Tracy Tire Fire Site Remediation Services

After burning for two and one-half years, Sukut was called upon to ...

Read More

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW