Projects

Toland Road Landfill Phase 4C Liner Expansion Project
Sukut is excavating 1.1 million cubic yards of earth at the Toland Road ...
Read More
El Sobrante Landfill Mine Reclamation and Cell 13B Excavation Project
The work is split up into two projects. The first project includes the ...
Read More
Badlands Sanitary Landfill, Phase 2 Stage 1 Liner Expansion Project
The project on this 98-acre site involves 3,000,000 cubic yards of ...
Read More
Prima Deshecha Landfill, Infrastructure Phase 1A Project
Sukut is constructing additional on and off-ramps for Orange County Waste ...
Read More
Altamont Landfill FA2 Phases 6 and 7 Project
Sukut is working on this two-year contract that includes two phases of cell ...
Read More
OAL Landfill Gas Header Upgrade Phase 1 Project
On this project, Sukut is installing approximately 4,000 linear feet of ...
Read More
Landers Sanitary Landfill Phase 1A Project
Sukut constructed the Phase 1A cell expansion of the Landers Landfill for ...
Read More
FRB Landfill Phase VIII-A1 Groundwater Protection Project
Sukut is constructing the Phase VIII-A1 groundwater protection liner system ...
Read More
Colton Sanitary Landfill Project
The project includes the installation of four million square feet of 50 mil ...
Read More
FRB Landfill Sewer and Water Line Treatment System Design-Build Project
The primary objective of this project is to contain Frank R. Bowerman ...
Read More
Altamont Landfill FA2 Phase 5 and Compost Facility Contact Water Pond 2 Project
Sukut performed landfill improvements by excavating roughly 600,000 cubic ...
Read More
Keller Canyon Cell Phase 2F Project
This seven-acre cell construction project involved the excavation of ...
Read More
Olinda Alpha Phase 1A Valencia Greenery Project
The project includes the construction of a compost greenery at the Olinda ...
Read More
American Avenue Disposal Site Phase 1 Waste Relocation Project
The work consists of the relocation of buried wastes currently located ...
Read More
North County Landfill Area 6 Recycling Center and Sanitary Landfill Project
The project included 250,000 cubic yards of excavation to stockpile and ...
Read More
Barstow Sanitary Landfill Liner 1B Project
This project included excavating 460,000 cubic yards of earth, installing ...
Read More
Guadalupe Recycling and Disposal Phase 3 Module IV Base Liner Project
The project included the excavation of 170,000 cubic yards to stockpile and ...
Read More
Vasco Road Landfill DU-13B Cell Construction 2022 Project
The project included excavation and stockpiling of 175,000 cubic yards of ...
Read More
Antelope Valley Public Landfill Cell Phase V-B Project
This project for Waste Management consisted of 1.5 million cubic yards of ...
Read More
El Sobrante Landfill Phase 13A Liner and Leachate Collection System Project
On this project, Sukut performed work that included excavation, fine grade, ...
Read More
Prima Deshecha Landfill Zone 4 Habitat Mitigation Project
Sukut performed drainage improvements at the Prima Deshecha Landfill which ...
Read More
Prima Deshecha Landfill Zone 1 Phase D2 Liner and Groundwater Project
Sukut worked on the expansion of the groundwater protection liner system at ...
Read More
Prima Deshecha Landfill Fee Booth Relocation and Entrance Improvements CMAR Project
Acting as a CMAR, Sukut made significant infrastructure upgrades to the ...
Read More
El Sobrante Landfill Phase 13A Project
This project included clearing, excavating 4,500,000 cubic yards of ...
Read More
Altamont Landfill FA2 Phase 4 Project
This project included the excavation of 1,300,000 million cubic yards of ...
Read More
Northern Branch for the 2020 Fire Debris and Tree Removal Project
Sukut entered into a joint venture with Pacific States Environmental ...
Read More
Tree Removal Services Project for the Camp Fire in Butte County
Acting as a Managing Partner, Sukut entered into a joint venture with Odin ...
Read More
Badlands Landfill C2P5 and C3P2 Liner Expansion Project
This project involved over 10,000 cubic yards of excavation and engineered ...
Read More
Disaster Debris Removal and Disposal Services Project
This project is for the on-call services to respond to any natural ...
Read More
Prima Capistrano Greenery Project
This project involved moving over 100,000 cubic yards of dirt and providing ...
Read More
FRB Bee Canyon Greenery Project
This project consisted of 740,000 cubic yards of earthwork, construction of ...
Read More
El Sobrante Landfill Phase 12 Liner and LCRS and Phase C2 Partial Final Closure Project
This is a combination of two projects. The first project was a 10-acre ...
Read More
San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project
The work on this project included excavation of up to two million cubic ...
Read More
Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project
The project included the excavation of 1.4 million cubic yards of soil ...
Read More
Chiquita Canyon Landfill C6 Liner Project
The project included the excavation of one million cubic yards of soil for ...
Read More
Butte Fire Debris Removal Project
The Butte Fire that started on September 9, burned 70,868 acres. In the ...
Read More
Sunshine Canyon Landfill CC-4P3 Liner Construction Project
This mass excavation project consisted of 700,000 cubic yards of material ...
Read More
Camp Fire Debris Removal Cleanup Project
Sukut entered into a joint venture with Goodfellow Bros. and Pacific States ...
Read More
El Sobrante LF Phase C 1 Partial Final Closure Project
This project for Waste Management consisted of approximately 1.5 million ...
Read More
Mid Valley Landfill Unit 4 Ph 1 Liner Construction
The project included the installation of 24-inch thick low permeability ...
Read More
Clear Lake Shoreline Cleanup
This project involved an emergency cleanup of wildfire debris that was ...
Read More
Olinda Alpha Landfill Phase 2
Sukut continued work at the active Olinda Alpha Landfill with the Phase 2 ...
Read More
Wildfire Post Debris Removal
Sukut has been contracted by the California Governor’s Office of Emergency ...
Read More
Santa Rosa/Napa Fire Debris Cleanup
Sukut Construction was awarded the Santa Rosa/Napa Fire Debris Cleanup ...
Read More
Thomas Fire Project
At the beginning of 2018, Sukut was contracted by CalRecycle to perform the ...
Read More
Detwiler Fire Debris Removal and Recovery
The project scope included the removal, storage, transportation, and ...
Read More
Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project
The project consisted of the construction of a composite liner system ...
Read More
Frank R. Bowerman Landfill
Located in Irvine, Sukut developed a new landfill cell including mass earth ...
Read More
Prima Deshecha – Landfill
This project supported the landfill expansion and placement of liners in ...
Read More
Tracy Tire Fire Site Remediation Services
After burning for two and one-half years, Sukut was called upon to ...
Read More