El Sobrante Landfill Mine Reclamation and Cell 13B Excavation Project

Client:
Waste Management
Location:
Corona, CA
Description of Project:

The work is split up into two projects. The first project includes the excavation and stockpile for the future cell expansion of roughly 1,450,000 cubic yards with drainage installation on the stockpiles. The second project consists of the excavation of the old mine tailings of approximately 150,000 cubic yards, a property of about 500,000 cubic yards, and the installation of concrete drainage devices.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW