Mid Valley Landfill Unit 4 Ph 1 Liner Construction

Client:
San Bernardino Public Works
Total Value:
$27,728,663.00
Location:
Rialto, CA
Description of Project:

The project includes installation of 24-inch thick low permeability material, with a combination of both slope and floor over a 2.5-million square feet area. Additionally, the scope of work includes construction of a leachate sump, pump system, LCRS storage containment area, and leachate loading/transfer system. Two stormwater basins will also be constructed to serve as the landfills stormwater runoff containment, along with miscellaneous civil and drainage improvements in the landfill.

© 2021 Sukut Construction LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW