FRB Landfill Phase VIII-A1 Groundwater Protection Project

Client:
Orange County Waste & Recycling
Location:
Irvine, CA
Description of Project:

Sukut is constructing the Phase VIII-A1 groundwater protection liner system at the Frank R. Bowerman Landfill. The project includes over eight million cubic yards of earthwork for the cell excavation, landslide remediation, and buttress fill placement. The project also involves 1.5 million square feet of geosynthetic liner installation, 25,000 tons of leachate collection gravel, 55,000 linear feet of leachate collection and landfill gas piping, design and installation of a dewatering system, and various civil improvements to the site’s drainage and electrical infrastructure.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW