Altamont Landfill FA2 Phases 2 and 2B Containment, and Phase 3 Expansion Project

Client:
Waste Management
Location:
Livermore, CA
Description of Project:

The project includes excavation of 1.4 million cubic yards of soil needed to construct a new cell for Waste Management. Scope of work also calls out for underdrain and LCRS installation of about 10,000 linear feet of HDPE pipe, along with a four-layer cell system. The four layers will consist of the following materials: gravel layer, earth fill layer, low permeability layer, and protective soil cover layer. The project is scheduled to run through the fourth quarter of 2019.

© 2020 Sukut Construction LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW