Keller Canyon Cell Phase 2F Project

Client:
Republic Services
Location:
Pittsburg, CA
Description of Project:

This seven-acre cell construction project involved the excavation of 100,000 cubic yards of soil and placement of engineered fill, 25,000 cubic yards of the low permeability clay liner, and the import of about 20,000 tons of pea gravel for the cell floor. 

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW