- Client:
- Waste Management
- Location:
- Livermore, CA
- Description of Project:
-
This project includes the excavation of 1,300,000 million cubic yards of soil to stockpile, with approximately 300,0000 cubic yards of blasted material. Work consists of placing underdrain gravel layer, earthfill layer, low permeability layer, LCRS gravel layer, and lastly, a one-inch minus operations layer. Erosion control measures will be implemented once the project is completed.