Cajon Air Center Drainage Project

Client:
County of San Diego
Date Completed:
August 30, 2020
Location:
El Cajon, CA
Description of Project:

On this project, Sukut installed approximately 3,000 feet of concrete pipe in the location of the existing earthen swale used for stormwater conveyance, and 820 feet of an additional RCB from the center of the new concrete pipe, connecting to an underground detention basin. The project also included the installation of separated ingress and egress connection points between the adjacent 70-acre site and Taxiway Delta. All of the impacted areas were re-contoured, compacted, and hydro-seeded using a native seed mix for erosion control.