FRB Bee Canyon Greenery Project

Client:
OC Waste & Recycling
Location:
Irvine, CA
Description of Project:

This project consisted of 740,000 cubic yards of earthwork, construction of a 784,000-square foot asphalt compost deck, a water supply system, a fire water system for Orange County Fire Authority, water tanks, lined stormwater basin, and miscellaneous civil improvements for the County of Orange. The project’s scope also included re-routing power for the county’s new pump system.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW