- Client:
- Coachella Valley Water District
- Location:
- Thermal, CA
- Description of Project:
-
The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch steel pipeline, the Oasis Tower bypass system, irrigation lateral 97.1 Tie-In, and a reinforced concrete control structure that includes pumps, motors, valves, couplings and appurtenances. The work also included a reservoir liner, and electrical and surface restoration.