Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

Client:
Hi-Desert Water District
Location:
Yucca Valley, CA
Description of Project:

The project was adjacent next to another Hi-Desert Water District project, also executed by Sukut. The scope consisted of constructing over 32 miles of gravity sewer pipeline and 422 polymer manholes. The pipes ranged in size from 6” to 21”, and vary in depth from 6’ to 25’. Construction of the system included four jack and bore crossings through Caltrans Right of Way at Highway 62, and one jack and bore crossing across San Bernardino County Flood Control of Way.