Lakewood Stormwater Capture at Mayfair Park Project

Client:
City of Lakewood
Total Value:
$10,045,000
Location:
City of Lakewood, CA
Description of Project:

The work included 35,000 cubic yards of export, excavation of 92,700 cubic yards, shoring beam and plate, installation of 914 underground storage units, removal and replacement of 2 new tennis courts, 12’ wide sidewalk, 8’ wide sidewalk, new building extension, stormwater harvesting system, including filters pumps, diversion structure, rubber dam, pneumatic date, active control, new landscape, 3 new T-Ball backstops, electrical, sewer, recycled water line,storm drain pipe, catch basin, new lighting, and fencing.