- Client:
- Waste Management
- Location:
- Livermore, CA
- Description of Project:
-
This project included the excavation of 1,300,000 million cubic yards of soil to stockpile, with approximately 300,0000 cubic yards of blasted material. Work consisted of placing an underdrain gravel layer, earthfill layer, low permeability layer, LCRS gravel layer, and lastly, a one-inch minus operations layer. Erosion control measures were also implemented once the project was completed.