El Sobrante LF Phase C 1 Partial Final Closure Project

Client:
Waste Management
Location:
Corona, CA
Description of Project:

This project for Waste Management consisted of approximately 1.5 million cubic yards of excavation for a new cell expansion and a 31 AC landfill closure which included working in and around the existing landfill gas system and the installation of miscellaneous drainage structures to protect the site.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW