OAL Landfill Gas Header Upgrade Phase 1 Project

Client:
County of Orange, OC Public Works
Location:
Brea, CA
Description of Project:

On this project, Sukut is installing approximately 4,000 linear feet of 30-inch landfill gas header to upgrade the existing 18-inch header. This work includes a temporary landfill gas jumper system to keep the existing landfill gas system operational during construction. The project also involves the abandonment and installation of various existing landfill gas lines, butterfly valves, and tees. Lastly, Sukut will also install a 42-inch corrugated drainpipe, perform asphalt paving, and construct concrete aprons and utility crossings.