Prima Deshecha Landfill Zone 1 Phase D Mass Excavation and Liner Project

Client:
Orange County Waste and Recycling
Location:
San Juan Capistrano, CA
Description of Project:

The project consisted of the construction of a composite liner system including mass excavation, a subdrain and leachate collection system, a low-permeability soil layer, a drainage gravel layer, and importation and placement of operations layer and geosynthetics. The project also included landfill gas pipeline construction, concrete drainage, a lined stormwater basin, and other miscellaneous civil improvements to the site.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW