San Timoteo Sanitary Landfill Unit 2 Phases 3-2 and 4 Groundwater Protection System Composite Liner Construction project

Client:
County of San Bernardino
Location:
Redlands, CA
Description of Project:

The work on this project included excavation of up to two million cubic yards of material, construction of a desilting basin, two engineered stockpiles, 17 acres of composite geo-membrane liner, storm water infrastructure, and a new paved haul road. The project also included a leachate collection system, an electrical service drop, and controls to support both the leachate pumping system and the storm water pumping system.