Sunshine Canyon Landfill CC-4P3 Liner Construction Project

Client:
Republic Services
Location:
Sylmar, CA
Description of Project:

This mass excavation project consisted of 700,000 cubic yards of material to be stockpiled, the construction of a liner, which included various layers: low permeability, sand, gravel, protective soil cover, along with the various geosynthetic layers in between. Additional installation included 7,000 linear feet of subdrain, and 2,000 linear feet of LCRS pipe.

© 2024 Sukut Construction, LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW