- Client:
- Ventura Regional Sanitation District
- Location:
- Santa Paula, CA
- Description of Project:
-
Sukut is excavating 1.1 million cubic yards of earth at the Toland Road Landfill Phase 4C Liner Expansion project in Santa Paula, CA. In addition to the excavation, Sukut is installing 430,000 square feet of liner, 2,500 linear feet of LCRS pipe, and 500 linear feet of storm drain.