- Client:
- Lennar Communities
- Location:
- Yorba Linda, CA
- Description of Project:
-
Sukut performed the remedial grading and mass excavation of this 34-acre site that now houses 74 single-family lots. In addition, the project included the construction of a cast-in-place vehicular bridge to provide access to the new community. Sukut also constructed a backbone storm drain system inclusive of over 700 linear feet of seven-foot by eight-foot RCB, twelve-foot by five-foot RCB, transition structures, and a detention basin with inlet and spillway structures.