Projects
Gerber and Elder Creek Project
Sukut is working at the Gerber and Elder Creek project, a Lennar Homes ...
Read MoreRMV Tract 19227 Flood and Storm Drain Improvements Project
This project involves constructing a series of five water ...
Read MoreRMV 30-Inch CMLC Cow Camp and Gibby Road Project
Sukut is installing approximately 2,100 linear feet of backbone ...
Read MoreSan Juan Meadows Rough Grading and Storm Drain Project
On this project, Sukut is performing mass grading, partial landfill ...
Read MoreCielo Vista Rough Grading, Bridge, and Line D Storm Drain Improvements Project
Sukut performed the remedial grading and mass excavation of this 34-acre ...
Read MoreThe Terraces at Walnut Project
Sukut performed the rough grading, including the excavation of 2.2 million ...
Read MoreWestlake Phase 2 Lake 2 Construction Project
As a general contractor on this project, Sukut oversaw the dewatering, ...
Read MoreRienda Zones A and 1 Tank Site and Pipelines Project
Sukut performed work that consisted of constructing the Rienda interim ...
Read MoreSan Marcos Highlands Grading Project
This residential rough grading project for KB Home involved earthmoving ...
Read MoreThe Highlands at Tesoro del Valle Project
This rough grading project is located on the 400-acre site and involved ...
Read MoreCow Camp Road Phase 2B and SMVD Improvements Project
The Cow Camp Road 2B Roadway & SMWD Improvements project in Rancho ...
Read MoreMontebello Hills Grading Phases A and B Project
This project includes 3.7 million cubic yards of remedial grading and 5.6 ...
Read MoreRMV PA 3.1 and CCR Rough Grading Project
Project included mass excavation of 3,000,000 cubic yards and nearly ...
Read MoreFedEx Ontario Airport Expansion Project
On this project, Sukut handled 450,000 cubic yards of over-excavation and ...
Read MoreHidden Canyon PA 18
Sukut moved over 3.2 million cubic yards of dirt and rock to create 258 ...
Read MoreRancho Mission Viejo The Ranch – PA 2.3 ,2.4 Los Patrones Grading and Storm Drain
Sukut installed 12,000 linear feet of storm drain ranging from 18” to 72”. ...
Read MoreRolling Hills Country Club Grading and Storm Drain
This project involved the transforming of the existing golf course and ...
Read MorePorter Ranch Project
This hillside residential grading project was the last phase of the Porter ...
Read MoreHyundai-Kia Proving Ground
Sukut graded and paved a 6.5-mile oval test track for the Hyundai/Kia ...
Read MoreHarmony Grove Project
This rough grading project for Standard Pacific included 3,000,000 cubic ...
Read MoreCrystal Cove
Sukut won the ASCE Project of the Year Award after moving 30 million cubic ...
Read MorePelican Hill Golf Course and Resort
In 1990, Sukut built the world-renowned Pelican Hill golf course. In 2005, ...
Read MoreHeadlands Reserve
Located on the beautiful beaches of Dana Point, Headlands Reserve is now ...
Read MoreWalnut Hills – Three Oaks Project
Sukut moved more than 17 million cubic yards of dirt to create 268 mountain ...
Read MoreDos Lagos 18 Hole Golf Course
Sukut reclaimed the long-abandoned dumping ground site with an innovative ...
Read More