Hi-Desert Water District Barron Pump Station

Client:
Hi-Desert Water District
Total Value:
$2,637,500
Location:
Yucca Valley, CA
Description of Project:

The work included site clearing and grubbing, trenching, shoring, excavation, backfill, and compaction.  Additionally, the scope included the installation of the pump station and associated control equipment. A flow meter vault was constructed, as well as a diversion structure, manhole, underground piping, valves, instruments, and electrical.  Sukut also installed air conditioning, precast vaults, site security CMU wall with manual entrance gates, coatings and linings, including PVC and polyurethane linings, and provided site paving.

© 2024 Sukut Construction, LLC. All Rights Reserved.