- Client:
- Sacramento Area Flood Control Agency
- Location:
- West Sacramento, CA
- Description of Project:
-
Sacramento Area Flood Control Agency contracted Sukut to construct a 750,000-cubic yard detention basin. During the project, Sukut performed 250 acres of clearing, grubbing, and stripping of topsoil and native vegetation, as well as constructing a new 7.5-mile-long channel and widening the existing channel with over 250,000 cubic yards of excavation. Sukut also installed over 2,000 linear feet of RCP and construct six large single, double, and triple cast-in-place concrete box culverts.