Projects
![](https://sukut.com/wp-content/uploads/2023/04/Caltrans-Route-189-Emergency-Work-Project-670x400.jpg)
Caltrans Route 189 Emergency Work Project
This project involves the emergency closure of CA-189 to perform remedial ...
Read More![](https://sukut.com/wp-content/uploads/2023/01/1-670x400.jpg)
Canal Replacement Project, Segment 5B
On this project, Sukut crews are unwatering the existing canal and then ...
Read More![](https://sukut.com/wp-content/uploads/2022/10/Bouldin-Island-Levee-Improvement--670x400.jpg)
Bouldin Island Levee Improvement Project
On this project, Sukut will be stripping 55 acres of the existing farmland, ...
Read More![](https://sukut.com/wp-content/uploads/2022/09/Caltrans-07-343204-Rinaldi-Street-Undercrossing-670x400.jpg)
Caltrans 07-343204 I-405 Slope Repairs at Rinaldi Street Project
Sukut will reconstruct the steep earthen slopes along Interstate 405 ...
Read More![](https://sukut.com/wp-content/uploads/2022/08/Caltrans-07-339604-Route-14-Slope-Repair-Project-670x400.jpg)
Caltrans 07-339604 Route 14 Slope Repair Project
Sukut will reconstruct a 2,000-foot-long cut slope that was graded during ...
Read More![](https://sukut.com/wp-content/uploads/2022/07/Caltrans-08-0G6914-San-Bernardino-County-48th-Street-to-Route-18-138-Separation-Project-670x400.jpg)
Caltrans 08-0G6914 San Bernardino County 48th Street to Route 18/138 Separation Project
Sukut is installing 14 different drainage system improvements along State ...
Read More![](https://sukut.com/wp-content/uploads/2022/07/DJI_0080-670x400.jpg)
Pure Water Program Morena Conveyance System Project
Sukut is installing two separate pipelines, each nearly seven miles in ...
Read More![](https://sukut.com/wp-content/uploads/2022/02/SR46-0335-670x400.jpg)
SR-46 SLO Corridor Improvements Project
Sukut performed construction activities to widen the Cholame Section of ...
Read More![](https://sukut.com/wp-content/uploads/2021/12/SPQ-0271-670x400.jpg)
San Pasqual Undergrounding Project
Sukut removed, relocated, and replaced approximately two and a half miles ...
Read More![](https://sukut.com/wp-content/uploads/2021/11/RTE-4-670x400.jpg)
State Route 4 Wagon Trail Realignment, Phase 1 Project
This project will reconstruct approximately three miles of State Route 4 in ...
Read More![](https://sukut.com/wp-content/uploads/2021/09/North-Indio-website-670x400.jpg)
North Indio Flood Control Phase 2 Project
Sukut is constructing 16,000 linear feet of a flood control channel, with ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/Palm-Springs-MDP-Line-41-Stage-3-and-4-Project-670x400.jpg)
Palm Springs MDP Line 41 Stage 3 and 4 Project
On this project, Sukut is constructing approximately 6,000 linear feet of ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/1363-Lower-Elkhorn-Interior-Drainage-670x400.jpg)
Lower Elkhorn Interior Drainage Project
Sacramento Area Flood Control Agency contracted Sukut to construct a ...
Read More![](https://sukut.com/wp-content/uploads/2021/08/CA29-0424-670x400.jpg)
CalTrans Highway 29 Project
Sukut completed this three-mile-long highway realignment project that ...
Read More![](https://sukut.com/wp-content/uploads/2021/05/Walteria-Retention-Basin-Improvements-Phase-1-670x400.jpg)
Walteria Retention Basin Improvements Phase 1 Project
This project involves pump station upgrades, channel repairs, basin ...
Read More![](https://sukut.com/wp-content/uploads/2020/11/Oasis-2-670x400.jpg)
Oasis In-Lieu Recharge Phase II Project
Sukut is constructing approximately 17.5 miles of pipelines of various ...
Read More![](https://sukut.com/wp-content/uploads/2020/10/L-4-Pump-Station-Relocation-Project-Phase-II-670x400.jpg)
L-4 Pump Station Relocation, Phase II Project
Working for Coachella Valley Water District, Sukut is relocating the L-4 ...
Read More![](https://sukut.com/wp-content/uploads/2020/08/Cajon-Air-Center-–-Aircraft-Transient-Apron-Project-670x400.jpg)
Cajon Air Center – Aircraft Transient Apron Project
This project of building a transient aircraft apron connecting to existing ...
Read More![](https://sukut.com/wp-content/uploads/2020/01/OIL-0609-670x400.jpg)
Oasis In-Lieu Recharge Project
The project consisted of a 60 AF reservoir, 2835 linear feet of 72-inch ...
Read More![](https://sukut.com/wp-content/uploads/2019/10/Cajon-Air-Center-Drainage-670x400.jpg)
Cajon Air Center Drainage Project
On this project, Sukut installed approximately 3,000 feet of concrete pipe ...
Read More![](https://sukut.com/wp-content/uploads/2019/03/DJI_0269-670x400.jpg)
Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project
The project included the installation of approximately 40 miles of gravity ...
Read More![](https://sukut.com/wp-content/uploads/2019/01/IMG_0244-670x400.jpg)
Canyon Country Community Center Project
On this project, Sukut performed the following work: clear and grub, ...
Read More![](https://sukut.com/wp-content/uploads/2018/12/WFC-34794-670x400.jpg)
West Fontana Channel Project
This project for San Bernardino County Public Works included the ...
Read More![](https://sukut.com/wp-content/uploads/2018/10/news-awards-670x400.jpg)
La Novia Roundabout Project
The La Novia Roundabout Project was designed to improve traffic flow by ...
Read More![](https://sukut.com/wp-content/uploads/2018/09/HDWD-Barron-Pump-Station-Project-670x400.jpg)
Hi-Desert Water District Barron Pump Station
The work included site clearing and grubbing, trenching, shoring, ...
Read More![](https://sukut.com/wp-content/uploads/2018/08/DJI_0011-670x400.jpg)
CSA 70, Zone W4 – Pioneertown Pipeline Project
The scope of work consisted of the installation of 20,400 linear feet of ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/clinton-keith-complete-670x400.jpg)
Clinton Keith Road Construction Phase 2
Sukut completed new road construction on Clinton Keith Road Construction. ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1216-2-670x400.jpg)
Cajon Air Center Underground Detention Basin
This project entailed excavating down and installing a two-acre underground ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/1206-670x400.jpg)
La Pata Avenue – Schedule C
This project entailed constructing a new half-a-mile-long road, connecting ...
Read More![](https://sukut.com/wp-content/uploads/2018/07/IBC1214-670x400.jpg)
Industry Business Center West Side Grading Phase 2
This project entailed grading 250 acres, excavation of native unstable ...
Read More![](https://sukut.com/wp-content/uploads/2018/05/IMG_2682-670x400.jpg)
La Pata Avenue Gap Closure Project – Schedule B
Sukut was performing construction services on the La Pata project that ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/Heacock-Channel-Sunnymead-MDP-Line-B-Stages-3-and-4-670x400.jpg)
Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4
This flood control project consisted of dewatering, excavation, and the ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/lakewood-670x400.jpg)
Lakewood Stormwater Capture at Mayfair Park Project
The work included 35,000 cubic yards of export, excavation of 92,700 cubic ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/1248-670x400.jpg)
Hi-Desert Water District Wastewater Reclamation, Phase I, Package C
The project was adjacent next to another Hi-Desert Water District project, ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/clinton-keith-complete-roadway-phs-4-670x400.jpg)
Clinton Keith Road Phase 4 Project
This road project will include roadway and rock excavation for widening ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/2014-Oct-PORT-OF-LA-BERTH-144-145-BACKLANDS-IMPROVEMENTS-670x400.jpg)
Port of Los Angeles
Prime contractor Sukut Construction performed grading and demo operations ...
Read More![](https://sukut.com/wp-content/uploads/2014/04/Pipe-Instllation-Job-13697-Riverside-Drive-670x400.jpg)
Riverside Drive
A long, deep vertical cut was needed to install a storm drain pipe near ...
Read More![](https://sukut.com/wp-content/uploads/2013/07/SAPE_20JULY11_008-670x400.jpg)
Alton Parkway Extension
Sukut was the general contractor on this roadway and utility improvement ...
Read More![](https://sukut.com/wp-content/uploads/2018/03/toll-road_17JAN06_015-670x400.jpg)
Eastern Corridor 241-261 – Toll Road
A design-built project consisting of 26 miles of new roadway including six ...
Read More