Projects

Oasis In-Lieu Recharge Project, Phase II Project

On this project, Sukut is constructing approximately 17.5 miles of a ...

Read More

L-4 Pump Station Relocation, Phase II Project

Working for Coachella Valley Water District, Sukut is relocating the L-4 ...

Read More

Palm Canyon Wash, Stage 93 Emergency Levee Restoration Project

This emergency work contract consists of the repair and restoration of ...

Read More

Cajon Air Center – Aircraft Transient Apron Project

This project of building a transient aircraft apron connecting to existing ...

Read More

Oasis In-Lieu Recharge Project

The project consists of a 60 AF reservoir, 2835 linear feet of 72-inch ...

Read More

Cajon Air Center Drainage Project

On this project, Sukut installed approximately 3,000 feet of concrete pipe ...

Read More

New Model Colony Archibald and Edison Infrastructure Improvements

Sukut worked as a general contractor on the roadway and utility improvement ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package D Project

The project included the installation of approximately 40 miles of gravity ...

Read More

Canyon Country Community Center Project

On this project, Sukut performed the following work: clear and grub, ...

Read More

West Fontana Channel Project

This project for San Bernardino County Public Works includes the ...

Read More

Hi-Desert Water District Barron Pump Station

The work includes site clearing and grubbing, trenching, shoring, ...

Read More

CSA 70, Zone W4 – Pioneertown Pipeline Project

The scope of work consists of the installation of 20,400 linear feet of DIP ...

Read More

Technology Drive Street Improvements

This project involved Technology Drive Street improvements near Laguna ...

Read More

RMV Multi-Purpose Path

Sukut created a multi-purpose pathway for the residents of Rancho Mission ...

Read More

Clinton Keith Road Construction Phase 2

Sukut completed new road construction on Clinton Keith Road Construction. ...

Read More

Veterans Sports Park at Tustin Legacy

The Site was previously operated as a community park by the Department of ...

Read More

Cajon Air Center Underground Detention Basin

This project entailed excavating down and installing a 2 acre underground ...

Read More

Haven Avenue SD & Sewer

Sukut Construction successfully completed installation of underground ...

Read More

La Pata Avenue – Schedule C

This project entails a new road a 1/2 mile long, connecting Camino Del Rio ...

Read More

Industry Business Center West Side Grading Phase 2

This project entails grading 250 acres, excavation of native unstable soil ...

Read More

La Pata Avenue Gap Closure Project – Schedule B

Sukut was performing construction services on the La Pata project that ...

Read More

Trampas Canyon Dam and Reservoir Project

The Santa Margarita Water District contracted with Sukut to complete the ...

Read More

Upper Chiquita Reservoir Slope Repair

Sukut is performing repair services on the 1.5:1 slope that was damaged ...

Read More

Heacock Channel (Sunnymead MDP Line B) Stages 3 and 4

This flood control project consists of dewatering, excavation, and the ...

Read More

Moffett and Legacy Roadway Extension Project

The project involves grading, installation of approximately 3,000 lf of new ...

Read More

Orange County Great Park Western Sector Roadway Project

The project includes removal of existing utilities and roadway in order to ...

Read More

Lakewood Stormwater Capture at Mayfair Park Project

The work included 35,000 cubic yards of export, excavation of 92,700 cubic ...

Read More

Hi-Desert Water District Wastewater Reclamation, Phase I, Package C

Sukut was awarded a $28.7 million Wastewater Reclamation Project, located ...

Read More

Clinton Keith Road Phase 4 Project

This road project will include roadway and rock excavation for widening ...

Read More

Peters Canyon Channel Widening

Sukut conducted the final export operation required to complete the ...

Read More

San Vicente Dam

Sukut Construction worked as a subcontractor on the San Vicente Dam ...

Read More

Port of Los Angeles

Prime contractor Sukut Construction performed grading and demo operations ...

Read More

Central Avenue Realignment

Sukut performed the realignment of Central Ave. including constructing a ...

Read More

Riverside Drive

A long, deep vertical cut was needed to install storm drain pipe near dairy ...

Read More

Oxnard Airport

Sukut eliminated two aviation hazards caused by large open channels near ...

Read More

Tustin Armstrong

Sukut poured concrete for the 900 linear foot reinforced concrete box ...

Read More

Alton Parkway Extension

Sukut was the general contractor on this roadway and utility improvement ...

Read More

Channel Islands Campus

This was a turn key infrastructure project including two bridges, sewer and ...

Read More

Robert B. Diemer Water Treatment Plant North Access Road

Sukut constructed a one-mile hill side access road for the Metropolitan ...

Read More

San Pablo Dam Seismic Project

Sukut teamed with Raito, Inc. to upgrade San Pablo Dam by removing the ...

Read More

Upper Chiquita Reservoir

The Upper Chiquita Reservoir project required the excavation and placement ...

Read More

Cathedral City – Cove Infrastructure

Sukut upgraded outdated water, sewer and storm drainage systems, eliminate ...

Read More

Hillcrest High School

This new 50 acre campus for the new Hillcrest High School was recognized by ...

Read More

State Route 76 Widening & Realignment

Subcontractor to Granite Construction, Sukut excavated 325,000 cubic yards ...

Read More

Monument 250 Border Fence

This project entails the construction of six miles of border access road ...

Read More

Santa Ana River Trail

Sukut moved 35,000 cubic yards of dirt to accomplish this three and a half ...

Read More

Pepperdine University Graduate Campus

This project involved the movement of 3,000,000 cubic yards of earth in ...

Read More

© 2020 Sukut Construction LLC. All Rights Reserved.

Designed and managed by mediadozer.com

CALL NOW